Money Matter Blog
  • Investing
  • Stock
  • Latest News
  • Editor’s Pick
  • Economy
  • Investing
  • Stock
  • Latest News
  • Editor’s Pick
  • Economy
No Result
View All Result
Money Matter Blog
No Result
View All Result
Home Economy

Daydream-2 Operations Concluded

by
October 8, 2024
in Economy
0
Daydream-2 Operations Concluded

Elixir Energy Limited (“Elixir” or the “Company”) is pleased to provide an operational update on the Daydream-2 well in its 100% owned Project Grandis in Queensland’s Taroom Trough.

HIGHLIGHTS

Five out of six stimulated zones flowed gasAdditional deep coal flow to increase contingent resourcesStabilised flow rate less than previously measured but remediable in future wellsWell to be retained as a future gas producerAll licence commitments now met for ATP 2044 and retention lease to be sought

Elixir has now concluded its testing program of the Daydream-2 well and the well is being retained through a process of suspension as a future gas producer. The Coil Tubing Unit (CTU) has been released back to Elixir’s neighboring Operator to continue with its ongoing multi-well program.

All licence commitments have now been met for ATP 2044 and Elixir will now proceed with a process of applying for the licence to be deemed a retention lease (in Queensland this is called a Potential Commercial Area – PCA – which has a maximum term of 15 years).

The well delivered gas flow rates from five out of the six stimulated zones – including for the first time in two separate deep coal zones.

Achieving flows from these deep coals should allow the commencement of the conversion to contingent resources of the current prospective resources booked in the coals in ATP 2044 (see ASX announcement of 21 February 2024). Elixir will work with its independent auditors over this initial contingent resource booking in the coming months.

During the final phase of testing, gas was flowed at various rates and various choke sizes. A maximum flow rate of 2.6 MMSCFD was recorded and the stabilized rate was 1.0 MMCFPD prior to shut-in.

This reduction in stabilised rate has been attributed to condensate or water banking immediately around the wellbore.

This was likely caused by the multiple open and closures of the well during recent operations, or by adverse reactions to fluids introduced into the wellbore. Such issues are common in early stage tight gas plays globally and can be remedied by operational changes to fluid use and well management. Due to the appraisal nature of this well, the extensive multi-phase testing and evaluation undertaken (including for R&D purposes) was required as part of the planning for a future development.

Click here for the full ASX Release

This post appeared first on investingnews.com
Previous Post

IEF Applauds UK’s £21.7 Billion Carbon Capture Investment

Next Post

Harris said candidates must ‘earn’ voter support — despite skipping primaries before becoming Dem nominee

Next Post
Harris said candidates must ‘earn’ voter support — despite skipping primaries before becoming Dem nominee

Harris said candidates must ‘earn’ voter support — despite skipping primaries before becoming Dem nominee

Enter Your Information Below To Receive Trading Ideas and Latest News

    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

    Popular News

    Israel’s Netanyahu delays Gaza cease-fire deal, accusing Hamas of trying to back out

    Israel’s Netanyahu delays Gaza cease-fire deal, accusing Hamas of trying to back out

    January 16, 2025
    Trump foreign policy: 6 issues he got right and the experts were wrong

    Trump foreign policy: 6 issues he got right and the experts were wrong

    January 16, 2025
    CLAY TRAVIS: How Trump is already narrowing America’s racial divide

    CLAY TRAVIS: How Trump is already narrowing America’s racial divide

    January 16, 2025

    About Money Matter Blog

    • About us
    • Contacts
    • Privacy Policy
    • Terms and Conditions
    • Email Whitelisting

    Main Categories

    • Investing
    • Stock
    • Latest News
    • Editor’s Pick
    • Economy

    Latest News

    • Israel’s Netanyahu delays Gaza cease-fire deal, accusing Hamas of trying to back out
    • Trump foreign policy: 6 issues he got right and the experts were wrong
    • About us
    • Contacts
    • Privacy Policy
    • Terms and Conditions
    • Email Whitelisting

    Copyright © 2025 moneymatterblog.com | All Rights Reserved

    No Result
    View All Result
    • Investing
    • Stock
    • Latest News
    • Editor’s Pick
    • Economy

    Copyright © 2025 moneymatterblog.com | All Rights Reserved